| Date | Item | Department | Description | Amount | Outcome |
|---|---|---|---|---|---|
| 01/07/26 | #42 | DEPARTMENT OF ENVIRONMENTAL SE | Authorize to enter into a retroactive sole source amendment to the contract with Busby Construction Co., Inc., Atkinson, NH (originally approved by G&C on 7/27/22, Item #72, archived document ), for a | $747,000 |
approved
Wheeler
|
| 06/25/25 | #270 | DEPARTMENT OF ADMINISTRATIVE S | Authorize the Division of Public Works Design and Construction to enter into a sole source amendment to an existing contract with Busby Construction Co., Inc., Atkinson, NH (originally approved by G&C | $844,968 | approved |
| 05/07/25 | #75 | DEPARTMENT OF ADMINISTRATIVE S | Authorize the Division of Plant and Property to enter into a sole source retroactive contract with Busby Construction Co. Inc., Atkinson, NH, in the amount of $5,890 for installation of aggregate for | $5,890 | approved |
| 12/20/23 | #60 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Busby Construction Co., Inc., Atkinson, NH, on the basis of a sole bid received of $762,926 for culvert rehabilitation and replacemen | $762,926 | approved |
| 10/07/20 | #22 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Busby Construction Co., Inc., Atkinson, NH, for removal of the Exit 11 toll plaza, on the basis of a low bid of $577,724.50. Effectiv | $577,724 | approved |
| 06/19/19 | #193 | DEPARTMENT OF ENVIRONMENTAL SE | Authorize to enter into an agreement with Busby Construction Co., Inc., Atkinson, NH, to permanently repair the Winnipesaukee River Basin Program’s 24-inch sewer force main located in Laconia near Pen | $323,000 | approved |
| 01/10/18 | #22 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Busby Construction Co., Inc., Atkinson, NH, for culvert/slipline rehabilitation for the Red listed Bridge carrying NH 114 over Bowman | $865,568 | approved |
| 06/15/16 | #23 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Busby Construction Co. Inc., Atkinson, NH, for roadway resurfacing and improvements on approximately 5 miles of NH 106 from Perkins R | $7.2M | approved |
| 05/04/16 | #26 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Busby Construction Co., Inc., Belmont, NH, for improvements along NH Route 101 (Elm Street), from Wilton Road approximately 2,750 fee | $1.3M | approved |
| 10/15/14 | #45 | DEPARTMENT OF ENVIRONMENTAL SE | Authorize to enter into an agreement with Busby Construction Co., Inc., Atkinson, NH, for construction of the Maiden Lady Cove Force Main and Gabion Wall Repair, in the amount of $289,655. (2)Further | $289,655 | approved |
| 06/05/13 | #208 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Busby Construction Co., Inc., Atkinson, NH, for sliplining an existing corrugated metal arc pipe carrying Kelly Brook under NH Route | $128,136 | approved |
| 05/01/13 | #114 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Busby Construction Co., Inc., Atkinson, NH, for roadway rehabilitation on Old Dover Road beginning at the Somersworth-Rochester town | $464,464 | approved |